Projects
Gama Aviation
Project Overview
Gama Aviation required a robust internal partitioning system at their Gloucester Airport facility to create a clear physical boundary between clean areas and preparation zones. The installation needed to maintain a sterile environment without hindering the constant movement of heavy plant machinery and staff.
Our Solution
We installed a full height ThermalShield wall to provide maximum insulation and separation. Key features of this installation included:
- High speed industrial roller doors to allow for seamless vehicle and plant machinery access.
- Reinforced pedestrian doors to ensure safe and easy movement for on-site staff.
- Floor to ceiling thermal panels to maintain strict climate and hygiene standards.
The Result
This setup provides a durable and long term solution for high traffic aviation environments. It ensures total operational efficiency while meeting all necessary clean room requirements.



Have a project we can help with?
Speak to us today

