Projects
Unilever
Project Overview
The Unilever production facility in Leeds follows a strict hygiene protocol involving a high pressure wash down of the factory floor every day. The client needed a way to protect sensitive equipment and other areas of the plant from water spray and mist during this process.
Our Solution
We installed high level RapidFireWall panels designed specifically for high moisture environments. The project included:
- Strategic high level placement to act as a splash barrier during cleaning.
- Water resistant fabric partitions that can withstand daily chemical wash downs.
- Bespoke panel fitting to ensure the factory remains compliant with health and safety standards.
The Result
The installation ensures the factory infrastructure remains protected. This allows the cleaning teams to work efficiently without risking damage to nearby machinery or electronics.




Have a project we can help with?
Speak to us today

